Key points
- Turning a house into a restaurant or an office into an archive store can multiply the live load.
- SNI 1727:2020 sets minimum loads, which differ for residential, office, restaurant and storage use.
- PP 16/2021 Article 11(2) requires a revised PBG when a building's function or classification changes.
- A structural assessment should come before the interior design is final, not after the renovation.
A shophouse becomes an office, a house becomes a café, or an office floor fills up with archives and heavy shelving. A change of building use like this is often treated as an interior design matter, yet the loads on the structure can change a great deal. This article explains what to check before renovating: loads, the condition of the structure, and the building approval (PBG) and Certificate of Building Functionality (SLF).
What counts as a change of building use
Government Regulation (PP) No. 16 of 2021 groups buildings into five functions: residential, religious, business, social and cultural, and special (Article 4(2)). A combination is called a mixed function. The function and classification are stated in the building's PBG and SLF (Article 11(1)).
In practice, a change of building use can mean:
- A change between functions, for example a house (residential) turned into a café or clinic (business or social).
- A change in how rooms are used within the same function, for example offices turned into an archive, server room or meeting hall.
- New heavy equipment such as water tanks, machinery or a rooftop pool.
The second and third types are often overlooked, although their structural impact can be just as large. Think of a shophouse whose upper floor was once a family home and now hosts a training centre or meeting room. The building function may still be "business", but the number of people and the furniture on that floor can multiply. If the renovation also adds storeys, see what to check before adding a floor.
Why loads change when use changes
A structure is designed for a specific live load based on how each space is used. In Indonesia, minimum loads are set by SNI 1727:2020, which adopts ASCE 7-16. The minimum live load tables in this family of standards show how wide the differences are:
| Use of space | Minimum uniform live load |
|---|---|
| Residential (private rooms) | 1.92 kN/m² |
| Offices | about 2.40 kN/m² |
| Restaurants and dining rooms | 4.79 kN/m² |
| Lobbies, assembly with movable seats | 4.79 kN/m² |
| Retail, first floor | 4.79 kN/m² |
| Library stack rooms | about 7.18 kN/m² |
| Light storage | about 6.00 kN/m² |
| Heavy storage | about 11.97 kN/m² |
So a house converted into a restaurant may carry more than twice the live load it was designed for, and an office floor used as an archive store can be far heavier still. These figures are illustrations only; the values for your project must be taken directly from SNI 1727:2020 by an engineer.
Besides live load, a new use can also change:
- Superimposed dead load, such as new tiles, brick partitions or heavy ceilings.
- Seismic risk category, because the building's function affects its importance in seismic design. See our article on seismic risk categories in SNI 1726.
- New openings in slabs or walls for stairs, lifts or MEP services.
Check the structure before you renovate
A structural assessment should come before the interior design is final. Typical steps:
- Collect existing documents: structural drawings, calculation reports, as-built drawings and soil investigation data if available.
- Define the new use and layout clearly, including where heavy equipment and shelving will go.
- Inspect the building: cracks, corroded reinforcement, deflection and earlier alterations.
- Test materials if records are missing, for example rebound hammer and core drilling to estimate concrete strength.
- Re-analyse slabs, beams, columns and foundations for the new loads.
- Recommend: the structure is adequate, loads must be limited, or strengthening is needed.
Tip: If the original drawings are missing entirely, allow time for site measurement and testing. An assessment without data can only reach very conservative conclusions.
If the analysis shows a shortfall, structural strengthening such as jacketing, CFRP or steel bracing can be considered. Sometimes the simpler answer is to move heavy loads next to columns or down to the ground floor.
Permits: revised PBG and SLF
PP 16/2021 Article 11(2) states that when the function and/or classification of a building changes, the owner must apply for a revised PBG. The same regulation sets sanctions when a building is used differently from its PBG, including freezing or revoking the SLF (Article 12).
After renovation the building is occupied under an SLF. Periodic inspections during the occupancy stage feed the SLF renewal process (Article 70(2)). A clear structural assessment and updated drawings make that stage much easier; the steps are covered in our guide to SLF renewal.
Requirements and procedures can differ between local governments, so check with your city or regency before work starts.
Common mistakes
- Removing walls that turn out to carry load, especially in older houses and shophouses.
- Placing water tanks or large plant on the roof without a check.
- Filling upper floors with archive racks or dense stock.
- Applying for permits after the renovation, when structural findings are hard to fix.
- Assuming an old building must be strong because it has had no problems so far.
Conclusion
A change of building use almost always changes the loads, and sometimes the risk category and permit obligations too. Check the structure before renovating, not afterwards, so design, cost and permits can be planned correctly. Every building needs calculation by a competent engineer based on its real condition. Stadin can help through our existing building audit and assessment and SLF technical assessment services.
This article provides general information. Every project still needs to be analysed and calculated by a competent structural or geotechnical engineer, in line with the applicable SNI codes and regulations.