Key points
- Stadin's records list six hospital projects in Jakarta totalling almost 197,000 m² of floor area.
- RS PON is the largest, with 103,938 m² over 12 storeys.
- Hospitals with surgery and emergency units are risk category IV in SNI 1726:2019, with Ie = 1.5.
- Operating theatres need floors far quieter than offices.

Hospitals are among the most demanding buildings for a structural engineer. Stadin's records list six hospital projects in Jakarta, ranging from 12-storey hospitals to a 4-storey proton therapy building. This article summarises the facts of these projects and explains why hospitals are designed to stricter standards than ordinary buildings.
Facts about Stadin's hospital projects
These are the projects recorded in the hospital sector:
| Project | Storeys | Floor area |
|---|---|---|
| National Brain Centre Hospital (RS PON) | 12, 1 basement | 103,938 m² |
| EKA Hospital Puri | 12, 1 basement | 49,000 m² |
| RSU Adhyaksa | 9 + semi-basement | 14,500 m² |
| Jakarta Eye Center | 10, 2 basements | 12,500 m² |
| Proton Beam Therapy Building, RSPAD | 4, 1 basement | 9,602 m² |
| RSUP Persahabatan | 6 | 7,400 m² |
A few things stand out:
- RS PON is the largest, with 103,938 m² of floor area, more than twice that of EKA Hospital Puri. Its recorded project year is 2024.
- The six buildings total almost 197,000 m², or about 196,940 m².
- Jakarta Eye Center is the oldest project here, recorded in 2008. The 10-storey building has two basements and stands on driven piles.
- RSU Adhyaksa in Ceger, East Jakarta, is the newest, recorded in 2026.
- Five of the six buildings have a basement or semi-basement. Only RSUP Persahabatan is recorded without one. Hospital basements usually hold parking, plant rooms and utilities, so retaining walls, waterproofing and groundwater uplift become an important part of the structural design.
- Three projects are recorded in 2023: EKA Hospital Puri, the Proton Beam Therapy Building and RSUP Persahabatan, with RS PON following in 2024. Healthcare has become a significant part of Stadin's recent portfolio.
Why are hospitals designed to be stronger?
After a major earthquake, hospitals are needed most. SNI 1726:2019 therefore places hospitals with surgery and emergency units in risk category IV, with a seismic importance factor Ie = 1.5. Health facilities without those units fall in risk category III (Ie = 1.25), while offices and apartments are usually category II (Ie = 1.0).
All else being equal, the design seismic force for a category IV hospital is 50% higher than for an office building. A higher risk category can also raise the seismic design category, which brings stricter reinforcement detailing. Read more in our article on SNI 1726 risk categories.
Tip: Risk category depends on a building's function, not its size. A small clinic with an emergency unit can need higher seismic requirements than a much larger office. Make sure the building's function is settled early in design.
Quiet floors for operating theatres
A hospital must not only survive earthquakes; it must also be quiet in daily use. Operating theatres, patient rooms and some medical equipment are sensitive to floor vibration from footsteps, trolleys and machinery.
AISC (American Institute of Steel Construction) floor vibration guidance gives generic velocity limits that show the difference:
| Space | Generic limit (micro-inches/s) |
|---|---|
| Office (reference) | 16,000 |
| Hospital patient room | 6,000 |
| Operating theatre | 4,000 |
The lower the number, the stricter the requirement: an operating theatre needs a much quieter floor than an office. For highly sensitive equipment, the manufacturer's specification usually governs. Our article on floor vibration explains the general principles.
Other challenges in hospital buildings
Beyond earthquakes and vibration, hospital structures usually involve:
- Heavy equipment. Imaging machines, generators and water tanks impose concentrated loads on the slabs and beams beneath.
- Many openings and shafts. Medical gases, air conditioning and plumbing need numerous penetrations in slabs and beams, coordinated from the start.
- Radiation rooms. Radiotherapy rooms need very thick concrete walls and slabs. The Proton Beam Therapy Building is an example; see radiotherapy and proton bunkers.
- Long-term flexibility. Hospital layouts change as new services are added. A structure planned with adequate loads and spans accommodates those changes more easily.
Every hospital has different needs, so loads, structural system and details must be calculated by a competent engineer for that specific project.
Conclusion
Stadin's six hospital projects, totalling almost 197,000 m² of floor area, show the variety of healthcare buildings: from large 12-storey hospitals to a proton therapy building with thick concrete walls. What they share is a higher structural demand, both for earthquakes and floor comfort. For your hospital or healthcare project, talk to Stadin about structural design.
This article provides general information. Every project still needs to be analysed and calculated by a competent structural or geotechnical engineer, in line with the applicable SNI codes and regulations.
Sources
- Tinjauan pustaka SNI 1726:2019 kategori risiko dan faktor keutamaan gempa (Universitas Pembangunan Jaya)
- Facts for Steel Buildings Number 5: Vibration (AISC)
- Data proyek: company profile PT. Stadin Strukturindo Konsultan (2026)